The Extensive Survey Project (22CVE56) provided Civil Engineering students with practical field experience through Highway, NTP, OTP, and Water Supply projects. The Water Supply survey was conducted at BITM, while the other three projects were carried out at Kishkinda University. The survey camp was held from 30/08/2026 to 07/09/2026 under the guidance of Civil Engineering faculty. Students gained hands-on experience using Total Station, developed surveying skills, and learned to identify and solve real-life engineering problems through teamwork and practical application
